top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

Pipeline As-Built Survey

Location

North Dakota

Date

2021

Role and Responsibilities

Field Lead
Performed construction staking and as-built recording for 5,400 LF of 16" steel oil pipeline. Collected, sorted, and organized more than 6,000 data pts including weld locations, utility crossings, bends, ground elevations, rock shielding, anodes, and surface fixtures.

Project Type

Survey and As-Built

16” steel crude oil pipeline connection between storage terminals. The project Owner required specific and detailed as-built data collection criteria such as naming conventions, codes, and surface collection. One challenge was budgeted time vs. expected time onsite. Clear communication with project leadership and field leadership helped start the discussion about potential overruns so a modified budget/scope proposal could be developed.

WILLISTON, ND 58801 USA
MARK@ACCELERATEDCONSULT.COM
406.478.1083

© 2035 by Accelerated Consulting.

Powered and secured by Wix 

 

bottom of page